From brief to site-ready documentation.
A structured and collaborative process to ensure well-planned, coordinated and buildable BOH facilities.
Ten stages, in sequence.
Every stage produces something the next stage — and the wider project team — can work from.
Concept Brief
Understanding the operation, intent and constraints of the project.
Operational Analysis
Menu, capacity, service mode and working patterns are analysed.
Space & Flow Planning
Areas, adjacencies and movement of people, food, materials and waste.
Layout Development
Zoning developed into workable, buildable layouts.
Equipment Planning
Selection, sizing and positioning of equipment against the operation.
Technical Coordination
BOH requirements coordinated with architecture, structure and MEP.
BOQ & Specifications
Schedules, quantities and technical specifications prepared.
Tender / Procurement Documentation
Documentation issued so offers can be compared on one basis.
Site Coordination
Execution reviewed and coordinated against the approved plans.
Handover
Support through completion and operational readiness.
From operational brief to working kitchen.
Commercial kitchen planning is based on operational requirements, menu, capacity, workflow, equipment, hygiene, safety, utilities, maintenance and future adaptability.
“A well-planned kitchen is not simply a collection of equipment. It is an operational system where people, food, equipment, utilities and information move efficiently.”
Brief
Menu & Operation
Capacity
Space Planning
Workflow
Equipment
Technical Coordination
Documentation
Designing the system behind the operation.
An integrated approach to people, food, materials and waste ensures efficient, hygienic and practical hospitality operations.
Food Flow
- 01Receiving
- 02Storage
- 03Preparation
- 04Production
- 05Service
- 06Return
People Flow
- 01Staff Entry
- 02Changing
- 03Work Areas
- 04Service
- 05Support Areas
Material Flow
- 01Receiving
- 02Stores
- 03Production
- 04Service
- 05Return / Disposal
Waste Flow
- 01Segregation
- 02Temporary Holding
- 03Movement
- 04Collection
Laundry and waste, planned as processes.
Laundry planning
Efficient laundry planning ensures smooth linen flow, operational efficiency and long-term reliability.
- 01Soiled Linen
- 02Sorting
- 03Washing
- 04Drying
- 05Finishing
- 06Clean Storage
- 07Distribution
Waste management
Practical and hygienic waste management planning for cleaner and more efficient operations.
- 01Segregate
- 02Hold
- 03Move
- 04Collect
A facility that works.
What HFPC issues.
- 01
Concept layouts
- 02
Detailed BOH plans
- 03
Equipment layouts
- 04
Equipment schedules
- 05
BOQs
- 06
Technical specifications
- 07
Sections & elevations
- 08
Utility requirement schedules
- 09
MEP coordination inputs
- 10
Procurement documentation
- 11
Site coordination support
Planning a new facility?
Share your project requirements — the operation, the capacity and the stage you are at — and we will take it from there.
+91 9548839087 / New Delhi, India
